Floor Coating

URETHANE PRIMER For childern's playground (group standard)

usage
Elastic urethane primer for concrete and mortar surfaces, and children’s playgrounds

This paint is a moisture curing type one-component urethane primer that is cured by the reaction with moisture in the air. In particular, it is a special primer used for application of elastic urethane paints or shock-absorbing flooring materials for children's play facilities. It is used to reinforce the substrate and improve the adhesion with intermediate materials.

specification

Paint type
Polyurethane resin (One-Component)
Drying time
Drying time
Category 5℃ 20℃ 30℃
Set-to-touch 1.5 hours 30 minutes 15 minutes
Dry-through 12 hours 4 hours 2 hours
Over-coat (Min.) 18 hours 6 hours 3 hours
Over-coat (Max.) 2 days 1.5 days 1 days
Thinner
DR-700, DR-700L, DR-790
Specific gravity
0.98
Dilution ratio
▷ No dilution
Theoretical Coverage
0.15 ㎏/㎡ (Based on 50㎛)
Solid volume ratio
34±3 %
Color
Transparent
Thickness of dried film
50㎛
Flash point
17 ℃
Shelf life
12 months (5 ~ 35 ℃ indoor storage)
Packaging unit
16 L

how to use

Surface treatment
1. Cure concrete for at least 28 days at a temperature of 21℃ and a relative humidity of 50%.
2, Completely remove the oil, moisture, sand, dust, laitance and other foreign matter from the surface and maintain surface smoothness.
3. For high-strength concrete (260㎏/㎠ or higher), blasting treatment should be carried out.
Coating method
1. Apply thinly using a brush or roller so that it does not stagnate in the base during coating.
2. The undercoat should be sufficiently penetrated to the substrate, and if excessive coating is formed on the surface, adhesion failure may occur.
3. The required amount may vary depending on the surface condition.
Appropriate construction specifications
▷Primer : Urethane primer
▷Intermediate coating : Elastic field or elastic urethane system paint
▷Top coat(if necessary) : ELASTOMER TOP COAT (SOFT, SEMIHARD) DHDC-3000(S)
Coating conditions
1. Atmosphere Temperature: 5~35℃, Surface Temperature: 40℃ or below, Relative Humidity: 80% or less
2. Moisture content in the concrete: 6% or less