Heavy Duty Coating

DHDC-3600 Solvent-based epoxy top coat, high build

usage
Top coat for undercoated steel and concrete

This paint is a high build epoxy top coat that is used for painting structures in an environment that requires a firm film, adhesion, solvent resistance and chemical-resistant atmosphere. As it is a high build paint that can be applied as the dry film at a thickness of up to 100㎛ in one coat, it has an advantage of being able to shorten the painting process.

specification

Paint type
Epoxy polyamide / top coat / High build (Two-Component)
Drying time
Drying time
Category 5℃ 20℃ 30℃
Set-to-touch 2 hours 1 hour 40 minutes
Dry-hard 24 hours 10 hours 8 hours
Over-coat (Min.) 32 hours 24 hours 12 hours
Over-coat (Max.) 3 months 2 months 1 month
Maturation time 1 hour 30 minutes 20 minutes
Pot life 16 hours 12 hours 8 hours
Thinner
DR-100
Dilution ratio
▷Brush, roller coating: less than 15% ▷Airless, spray coating: less than 10%
Specific gravity
Approx. 1.3(Based on white color)
Theoretical Coverage
5.6 ㎡/ℓ (1 time - 100㎛)
Solid volume ratio
Approx. 56±1%
Color
White, other colors
Thickness of dried film
100㎛
Mixing ratio
Base(A)/Hardener(B)=5/1 (Weight ratio)
Flash point
At least 7℃
Gloss
Semi-gloss
Shelf life
12 months (Dry, cool, and dark place with good ventilation)

PRODUCT PROPERTIES (PHYSICAL PROPERTY DATA)

Epoxy top coat
A two-component epoxy top coat that has a superior dry film appearance and is suitable for airless spray coating. (for interior)
Excellent film property
Adhesion, water resistance, anti-corrosive properties, solvent resistance and chemical resistance are excellent.

how to use

Surface treatment
1. Completely remove oil, moisture, sand, dust, and other foreign matter from the surface to be coated.
2. Sufficiently dry the surface to be coated before coating.
3. The welded parts and corners need to be cleaned before coating.
Coating method
1. Although coating can be done by either brush or airless spraying, airless spray coating is best.
2. Airless spray coating :
- Tip diameter : 0.019"~0.025"
- Injection pressure : More than 3000 P.S.I (210㎏/㎠)
- Store the coating equipment after cleaning with an exclusive thinner immediately after use.
Preceding and follow-up coating
1. Preceding coating: steel - epoxy anti-corrosive paint, epoxy zinc and inorganic zinc primer
concrete - epoxy solvent-based clear and permeable clear primer
- Upon coating on the inorganic zinc paint, a mist coat is required.
2. Follow-up coating: Epoxy system, urethane system, PVDF paint
Remarks
1. Sufficient performance after last coating is achieved after drying for 7 days at 20℃.
2. For coating areas exposed to the outside, yellowing and chalking may occur in a short period of time
due to the effect of sunlight. Upon coating for areas exposed to the outside, be sure to apply top coat.