Heavy Duty Coating

CLEAN GUARD CU Ceramic urethane top coat

usage
Tunnel, building interior/exterior, steel structures and concrete, steel surfaces of various industrial facilities

This paint is a ceramic urethane top coat with excellent chemical stability and suitable for top coat on interior and exterior walls of buildings, tunnels and various steel structures due to its strong coating film, adhesion, weather resistance, chemical resistance and stain resistance.

specification

Paint type
Ceramic urethane / Top coat (non-yellowing type) (Two-Component)
Drying time
Drying time
Category 5℃ 20℃ 30℃
Set to Touch 1 hour 30 minutes 20 minutes
Dry-Hard 24 hours 18 hours 12 hours
Over-coat (Min.) 48 hours 18 hours 12 hours
Over-coat (Max.) 1 month 15 days 7 days
Maturation time 30 minutes 20 minutes 10 minutes
Pot life 6 hours 5 hours 3 hours
Thinner
DR-700
Dilution ratio
▷Brush, roller coating: less than 5%, ▷Airless, spray coating: less than 10%
Specific gravity
Approx. 1.2 (based on white color)
Solid volume ratio
Approx. 50±1%
Theoretical Coverage
6.25 ㎡/ℓ (2 coats - 80㎛)
Thickness of dried film
80㎛
Color
White, other colors
Flash point
At least 24℃
Mixing ratio
Base(A)/Hardener(B)=7/1(weight ratio)
Shelf life
12 months (well-ventilated dry, cold and dark location)
Gloss
Glossy

PRODUCT PROPERTIES (PHYSICAL PROPERTY DATA)

Weatherability
Weatherability or weather resistance is excellent in environmental conditions of exterior exposure.
Excellent film properties
It has a strong film, adhesion and chemical resistance.
Fire safety
Satisfaction of highway construction material quality standards(stain-resistant coating materials)

how to use

Surface treatment
1. Completely remove oil, moisture, sand, dust and foreign substances from the surface.
2. Sufficiently dry the surface to be coated.
3. After primer coating, clean up the welded areas (blackened and rusted areas) with a disc sander.
Then, touch up with this paint and continue coating.
Coating method
1. Coating can be done by either brush, roller, or airless spray coating.
2. Airless spray coating:
- Tip diameter : 0.017"~0.021"
- Injection pressure : 2500 P.S.I or higher(176㎏/㎠)
- Store the coating equipment after cleaning with an exclusive thinner immediately after use.
3. Sufficient performance after last coating is achieved after drying for 7 days at 20℃.
4. For one coat, about 40㎛ is appropriate, and if a thick coating is formed during one coat, sagging, bubbling, and popping may occur.
Preceding and follow-up coating
1. Preceding coating : Epoxy, urethane type